For Clicky Group, we rapidly activated our 1Gbps Preconnect® DIA (Dedicated Internet Access). Full fibre infrastructure was already installed throughout the backbone of The Hive, with distribution points on each floor, so it was simply a case of bringing Clicky Group’s suite online.
Within our Preconnect® buildings, a wayleave is already agreed, meaning Elevate already has access rights to install the necessary hardware. This in itself removes a huge chunk of the waiting time you’d expect from other ISPs. With this master wayleave in place, we can get tenants connected through Preconnect® in as little as 24 hours.
Preconnect® brings hyperfast internet connectivity with symmetrical speeds up to 10Gbps. While primary access is delivered through full fibre, in our six HyperCities, we can also offer diverse connections in the form of rooftop wireless, meaning an AlwaysOn, 100% uptime SLA.